2ND FLOOR POUR

2ND FLOOR POUR

in Thailand the first floor above the ground floor is referred to as the second floor – we are in Thailand.
Their were five workers and myself – they all had their own gum boots.
The whole area was poured with the hardest grade of ready mixed concrete which was lifted onto the second floor by a crane truck with a bucket that held about one third of a meter.